{"id":4362,"date":"2019-11-18T09:34:11","date_gmt":"2019-11-18T08:34:11","guid":{"rendered":"https:\/\/www.bilbaoria2000.org\/activity\/basurto-san-mames\/nuevos-accesos-a-la-a-8\/"},"modified":"2020-11-10T09:27:10","modified_gmt":"2020-11-10T08:27:10","slug":"new-accesses-to-the-a-8","status":"publish","type":"page","link":"https:\/\/www.bilbaoria2000.org\/en\/actions\/basurto-san-mames\/new-accesses-to-the-a-8\/","title":{"rendered":"New accesses to the A-8"},"content":{"rendered":"<div class=\"row\">\n<div class=\"col-md-12\">\n<p>BILBAO R\u00eda 2000 executed the section between the Cuesta de Olabeaga and the connection with the urban network, at the Torres Quevedo roundabout, of the new accesses to the A-8 from the centre of Bilbao.<\/p>\n<p>The execution of this section included the construction of a cavern under the road which will allow the Adif Bilbao-Santurtzi line to be accommodated in the future when it is routed underground as it passes through Olabeaga.<\/p>\n<p>The construction of this branch line, which crosses the area of San Mam\u00e9s, was the subject of different inter-institutional agreements between the Provincial Council of Bizkaia, Bilbao City Council and BILBAO R\u00eda 2000.<\/p>\n<\/div>\n<div class=\"col-md-6 m-auto m-t-20 m-b-40 p-t-20 p-b-20\" style=\"background-color:#f7f7f7\">\n<h3>DATA SHEET<\/h3>\n<ul>\n<li>Date of opening to traffic: 18 May 2013<\/li>\n<li>Length of the section executed by BILBAO R\u00eda 2000: 540 metres<\/li>\n<li>Installation of 5 kilometres of concrete beams<\/li>\n<li>Installation of 7,300 m2 of acoustic screens<\/li>\n<li>Pedestrian path towards Olabeaga, 290 m long, covering 18 m of slope<\/li>\n<\/ul><\/div>\n<p>\t<!--\n\t\n\n<div class=\"col-md-8 m-auto text-center p-b-30\">\n\t\t<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-size_150 wp-image-1150\" src=\"http:\/\/www.bilbaoria2000.org\/assets\/media\/2019\/11\/logo-union-europea-150x127.jpg\" alt=\"\" width=\"150\" height=\"127\" \/>\n\t<\/div>\n\n\n\t--><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>BILBAO R\u00eda 2000 executed the section between the Cuesta de Olabeaga and the connection with the urban network, at the Torres Quevedo roundabout, of the new accesses to the A-8 from the centre of Bilbao. The execution of this section included the construction of a cavern under the road which will allow the Adif Bilbao-Santurtzi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":489,"parent":4347,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/page-actuacion-detalle.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-4362","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/pages\/4362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/comments?post=4362"}],"version-history":[{"count":5,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/pages\/4362\/revisions"}],"predecessor-version":[{"id":7317,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/pages\/4362\/revisions\/7317"}],"up":[{"embeddable":true,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/pages\/4347"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/media\/489"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/media?parent=4362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}