{"id":4271,"date":"2019-11-20T13:06:14","date_gmt":"2019-11-20T12:06:14","guid":{"rendered":"https:\/\/www.bilbaoria2000.org\/activity\/barakaldo\/darsena-de-portu\/"},"modified":"2020-11-09T10:35:36","modified_gmt":"2020-11-09T09:35:36","slug":"portu-dock","status":"publish","type":"page","link":"https:\/\/www.bilbaoria2000.org\/en\/actions\/barakaldo\/portu-dock\/","title":{"rendered":"Portu Dock"},"content":{"rendered":"<div class=\"row\">\n<div class=\"col-md-12\">\n<p>Next to the Paseo de Ribera del Nervi\u00f3n is the Portu Dock, an old port area that served Altos Hornos de Vizcaya for decades. The docks were consolidated and regenerated in a way that blends the dock into the landscape of the new promenade. The regeneration works were carried out with the collaboration of the Port Authority of Bilbao and concluded in November 2007. In May 2020 the area underwent a reform, due to the development of one of the residential plots located around the Dock. <\/p>\n<\/div>\n<div class=\"col-md-6 m-auto m-t-20 m-b-40 p-t-20 p-b-20\" style=\"background-color: #f7f7f7;\">\n<h3>DATA SHEET<\/h3>\n<ul>\n<li>Opening date: 14 November 2006<\/li>\n<li>Construction of a new stone embankment and a new ramp to access the water<\/li>\n<li>Construction of new surrounding walkways<\/li>\n<li>Installation of a stainless steel railing and bollards<\/li>\n<li>Reform date: 29 May 2020<\/li>\n<li>New promenade with a 6.5-metre-wide pavement, 5.85 m. of trees and landscaped area and 2.5 m. of cycle lane<\/li>\n<li>Reform of the wharf to adapt it to the new levels<\/li>\n<li>Construction of a new square with a pedestrian ramp and terraced green area<\/li>\n<\/ul>\n<\/div>\n<div class=\"col-md-8 m-auto text-center p-b-30\"><img class=\"alignnone size-size_150 wp-image-1150 lazyload\" alt=\"\" width=\"150\" height=\"127\" data-src=\"http:\/\/www.bilbaoria2000.org\/assets\/media\/2019\/11\/logo-union-europea-150x127.jpg\"><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Next to the Paseo de Ribera del Nervi\u00f3n is the Portu Dock, an old port area that served Altos Hornos de Vizcaya for decades. The docks were consolidated and regenerated in a way that blends the dock into the landscape of the new promenade. The regeneration works were carried out with the collaboration of the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":959,"parent":4239,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/page-actuacion-detalle.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-4271","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/pages\/4271","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/comments?post=4271"}],"version-history":[{"count":3,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/pages\/4271\/revisions"}],"predecessor-version":[{"id":7275,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/pages\/4271\/revisions\/7275"}],"up":[{"embeddable":true,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/pages\/4239"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/media\/959"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoria2000.org\/en\/wp-json\/wp\/v2\/media?parent=4271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}